
Robotic Demolition for Confined & Live Environments
Built for AMP8 infrastructure. Safer demolition. Controlled delivery.
Remote-operated demolition for restricted access, tunnels and live assets — without exposing people to risk.
Supporting Tier 1 contractors across complex infrastructure schemes. Specialists in confined and live environments. Proven across water, tunnelling and industrial sectors
When access is restricted, conventional demolition becomes the risk
Confined spaces. Live assets. Tight access. Complex structures.
​
This is where traditional methods break down — increasing exposure, slowing progress, and introducing unnecessary risk.
GNAT UK delivers controlled demolition using robotic systems, hydrodemolition and precision cutting — selecting the right method for the constraint, not forcing the constraint to fit the method.
​
Specialist demolition capability, built around control
We combine multiple specialist techniques to deliver safe, buildable demolition in complex environments.
​
Robotic Demolition
Remote-operated systems for confined, elevated and high-risk environments.
​
Hydrodemolition
Controlled concrete removal where structural integrity must be maintained.
​
Diamond Drilling & Sawing
Accurate cutting and sectional removal where access and sequencing are critical.
​
Abrasive Cold Cutting
Spark-free cutting for hazardous or sensitive environments.
Designed for complex infrastructure and live assets
Our methods are built for environments where access is restricted and control is non-negotiable.
​
-
Water treatment works and AMP8 upgrades
-
Pumping stations and deep shafts
-
Tunnels and service corridors
-
Reservoir structures
-
Industrial and COMAH sites
-
Live operational environments
​
Reduce risk. Maintain programme. Stay in control.
Remove Risk
Keep operatives out of hazardous zones using remote-controlled methods.
Reduce Temporary Works
Minimise scaffolding, access systems and manual intervention.
Maintain Programme
Deliver predictable demolition in constrained, high-risk environments.
Bring us in early. Avoid solving it twice.
The earlier we’re involved, the more efficient — and safer — the outcome.
​
We help shape the method before constraints become problems.
​
Support:
-
Method development
-
Buildability input
-
Site trials
-
RAMS support
-
Programme integration
​
​
