Hydro-blasting on City Bridge Deck
Bridge Road Deck Renovation
This project required Surface Preparation on a Bridge Deck. Situated on a busy, major arterial city road, its location necessitated that Down Time had to be kept to an absolute minimum. so the operation demanded critical time-planning to facilitate completion in the shortest time possible! The Project involved the selective removal of damaged concrete to a depth of 150mm, to approximately 25mm below the last reinforcement bar, in preparation for re