Project · 28 February 2022 · Nick Turnbull
Brokk 330 with Steel Shears Removes Factory Roof Pipework

Some nice archive pics of one of our BROKK 330's fitted with Atlas Copco Steel Shears selectively removing a spaghetti junction of steel pipework from the roof of a factory complex.
Extended reach and powerful cutting forces eliminated the need for scaffolding towers — enabling safe, remote operation, and quick removal of the pipework.
Atlas Copco hydraulic shear attachments are a fast, controlled way to cut and crop steel girders, pipework, conduit and structural sections. Mounted on a Brokk arm with hydraulic flow tuned to the shear's spec, they produce a clean cut with no spark, no flame, and no thermal damage to surrounding material — which matters when the structure being cut sits next to other plant that has to stay in place.
Working at height inside a factory roof void traditionally means scaffold towers, MEWPs, or rope-access teams. Deploying a Brokk with extended arm reach often eliminates that requirement entirely — the operator stays at floor level, the machine reaches up to the work, and the cuts are made remotely. Programme savings come from the avoided scaffold mobilisation as much as from the cutting speed itself.
Share with a colleague
More projects
Project · 1 October 2025
Precision Cold-Cutting & BROKK Debricking within the Complex Geometry of a Large Refractory Vessel
Project · 2 December 2024
Turbine Hall Decommissioning — Bulk Concrete Cutting with HILTI Wire Sawing
Project · 1 July 2024
De-bricking a Contaminated Chromium Kiln with Brokk Robotics