GNAT UK

Method · 22 March 2026 · Nick Turnbull

A Masterpiece in Hydrodemolition

NALTA remote hydrodemolition rig stripping deteriorated concrete from reinforced rebar, the rebar emerging clean and bond-ready — selective concrete removal at its highest precision

Costain's £45m award at Rugby Newbold is another clear signal that AMP8 wastewater upgrades are moving into delivery.

Working in live treatment environments brings a different set of challenges — restricted access, ageing infrastructure and zero tolerance for disruption.

We've pulled together a short overview of how GNAT UK supports these types of schemes, using robotic demolition, hydrodemolition and precision cutting techniques proven across live water infrastructure.

If you're planning works where access is tight and downtime isn't an option — it's worth a look.

Contact our Sales team on sales@gnatuk.com

www.gnatuk.com

#AMP8 #WaterIndustry #Infrastructure #Hydrodemolition #Brokk #SevernTrent #NFDC #ConcreteCutting #Concreteremoval #Sawing #SafetyFirst #Sawing #Costain #PileBreakout #PrecisionCutting #pipeworkcutting

[Document: "Costain RAMP8 it up at Rugby N" - 8 pages]

Originally posted on LinkedIn: https://www.linkedin.com/feed/update/urn:li:activity:7440497868857126912/

Share with a colleague

Got a brief?

Tell us what you're dealing with — restricted access, live operations or sensitive structure. We'll define the right method and machine.