Project · 8 November 2023 · Steve Tempest-Mitchell
Railway Arch Refurbishment for a Safer Pedestrian Walkway

Pedestrian safety was the primary objective driving this bridge refurbishment initiative.
Along with countless other Beeching Era Railway Bridges, this arch had been totally blocked and sealed. Prior to our intervention, pedestrians had to negotiate heavy vehicular traffic on the main road, without the luxury of a dedicated walkway.
To rectify this, Gnat UK was entrusted with removing the obstructive stone and the concrete infill.
Our team utilised HILTI Track Saws to cut and isolate sections of the infilled structure, marking a pivotal initial phase in the arch's transformation and the establishment of a new pedestrian walkway. Our BROKK Robots, equipped with Hydraulic Peckers, then systematically deconstructed the concrete infill.
As our deconstruction work progressed, the Main Contractors consolidated the void by pneumatically projecting SHOTCRETE onto the surface at high velocity in preparation for the construction of the new Pedestrian thoroughfare.
The Main Contractor was delighted when Gnat UK's work was completed a full three days ahead of the estimated schedule.
By addressing such safety concerns, we are not only preserving our industrial heritage, but also ensuring that our urban environments become more accessible and secure for everyone.
On site — more from this project
6 additional photos. Tap any image to view full size.
Share with a colleague
More projects
Project · 1 October 2025
Precision Cold-Cutting & BROKK Debricking within the Complex Geometry of a Large Refractory Vessel
Project · 2 December 2024
Turbine Hall Decommissioning — Bulk Concrete Cutting with HILTI Wire Sawing
Project · 1 July 2024
De-bricking a Contaminated Chromium Kiln with Brokk Robotics