Hydrodemolition on a Slippery Slope!
A number of Technical and Operational issues had to be addressed during this refurbishment project on a major UK Reservoir Extreme...

Nick Turnbull
Dec 29, 20221 min read
Â
Â
Â
Hydroblasting Rebates in a Factory Floor
This project required the accurate cutting and chasing in of 2500 metre long by 100mm wide x 50mm deep Rebates into an existing Factory...

Steve Tempest-Mitchell
Oct 28, 20221 min read
Â
Â
Â
Refractory Kiln De-Construction
Gnat UK's innovative Kiln De-Bricking solution, utilising a specially adapted Remote Manipulator System GNAT UK was tasked to devise an...
Nick Turnbull
Oct 1, 20221 min read
Â
Â
Â
NALTA Concrete Hydro-demolition
To compliment our large scale Robotic Hydroblasting Operations, Gnat UK also deploy NALTA Systems - designed to replace hand lances for a...
Nick Turnbull
Aug 21, 20221 min read
Â
Â
Â


Diesel do Nicely!
The bulk of our Robotic Demolition Fleet comprises powerful and versatile 3-Phase Electric BROKK and Husqvarna Demolition Robots....
Nick Turnbull
Jul 27, 20221 min read
Â
Â
Â
The Art of Diamond Wire Sawing Raw Sewage Flume Pipes
An overhaul of a Major Sewer complex in the heart of Glasgow required the removal of 1.6 meter diameter, 25mm thick steel flumes. Being a...
Nick Turnbull
Apr 27, 20221 min read
Â
Â
Â


Hydro-blasting on City Bridge Deck
Bridge Road Deck Renovation This project required Surface Preparation on a Bridge Deck. Situated on a busy, major arterial city road, its...
Nick Turnbull
Mar 27, 20221 min read
Â
Â
Â


Hydrodemolition on a North Sea Jetty
This project, on an exposed North Sea Coast Sea jetty, was successfully completed in what can best be described as "changing and...
Nick Turnbull
Dec 1, 20211 min read
Â
Â
Â


Railway Tunnel Reconstruction
Major breakthrough!! The Farnworth Tunnel re-boring! Steady Away! Northwest Electrification works hit a significant milestone with...
Nick Turnbull
May 18, 20211 min read
Â
Â
Â


Sensitive Bank Vault Deconstruction- In a Grade 1 listed building!
This project involved the conversion of a Grade I listed building in the centre of London, housing a former Bank of England holding vault...
Nick Turnbull
May 10, 20212 min read
Â
Â
Â


York Walkway - Diamond Sawing Saves the Day
The conversion of a significant York City Center office block into luxury flats was completed 20 weeks early, thanks to an eleventh-hour...
Nick Turnbull
Apr 9, 20212 min read
Â
Â
Â